ACC Limited Thermal Power Plant

Awesome Image

Project Information

Demolition & Dismantling of all Used CPP (TG-1 and SG-1)Boiler & Turbine equipment along with other movable assets together with components, auxiliaries, non-live cables, appliances, accessories and other spare parts located within the premises
  • Client:ACC Limited
  • Location:Wadi, Karnataka
  • Year Completed:Ongoing
  • Sale Value:Rs.6.14 Crores

ACC Limited Thermal Power Plant

ACC Limited, previously known as The Associated Cement Companies Limited, was established in Mumbai, Maharashtra, on 1 August 1936. The company manufactures, markets, and sells various types and grades of Cement and value-added products. It has several Cement Plants at various locations in India and has a thermal power plant located at Wadi.

Symcom Exim, a premier demolition and dismantling contractor, is currently carrying out a significant project worth Rs.6.14 Crores for ACC Limited at Wadi, Karnataka. The project involves demolishing and dismantling all used CPP (TG-1 and SG-1) Boiler & Turbine equipment, along with other movable assets, components, auxiliaries, non-live cables, and appliances, accessories, and other spare parts located within the premises.

Project Details

  • Wadi, Karnataka
  • Sale Value: Rs.6.14 Crores

The primary objective of the project is to remove all the obsolete and redundant equipment, clearing the site for the construction of new facilities. The project’s scope includes dismantling and demolishing a wide range of equipment and structures, such as boilers, turbines, generators, transformers, electrical equipment, and other related components.

The team at Symcom Exim has been working closely with ACC Limited to develop a comprehensive plan for the project, considering the site’s specific requirements and constraints. The team has utilized the latest demolition and dismantling techniques and equipment to ensure the work is completed safely, efficiently, and within the agreed timeline.

As part of the project, Symcom Exim has undertaken the removal and disposal of all scrap and salvage materials in compliance with relevant regulations and best practices. The team has meticulously sorted and categorized all materials for disposal or recycling, ensuring that all waste is handled in an environmentally responsible manner.

Throughout the project, Symcom Exim has maintained high safety and quality control, focusing on minimizing potential risks to personnel or the surrounding environment. The team has worked closely with ACC Limited and other stakeholders to ensure the project is completed successfully, with minimal disruption to ongoing operations.

The project has been progressing smoothly, with the team achieving key milestones within the agreed timeline. The team at Symcom Exim is committed to ensuring that the project is completed to the highest standards, delivering on time and within budget.

In conclusion, the demolition and dismantling project undertaken by Symcom Exim for ACC Limited at Wadi, Karnataka, is a significant project worth Rs.6.14 Crores. The project involves demolishing and dismantling all used CPP (TG-1 and SG-1) Boiler & Turbine equipment, along with other movable assets, components, auxiliaries, non-live cables, appliances, accessories, and other spare parts located within the premises. The project is progressing smoothly, with the team at Symcom Exim working closely with ACC Limited to ensure that the project is completed safely, efficiently, and within the agreed timeline.